Voltaire InfiniBand Interconnects - Read This First Documentation Roadmap
Title/Publication Date/Contents
Voltaire Switch User Manual for Grid Directors ISR 9096 and ISR 9288 and Grid Switch ISR
9024 (March 2007)
Topics covered include:
• InfiniBand, ISR 9024, ISR 9288/9096, and Voltaire switch management overview
• CLI overview
• Initial system setup
• Installing the GridVision Integrated Manager
• Updating, backing up, and upgrading the software
• GridVision Graphic Device Manager
• GridVision Integrated Graphic Fabric Manager
• Detailed description of Fabric Manager
• Node name settings
• tConfiguring the fabric – Subne Manager
• Bad ports configuration mode
• Configuring routing algorithms
• Partitioning and networks
• Configuring quality of service (QoS)
• Configuring nodes
• Rack grouping
• Configuring FTP
• Large-scale operations
• Fabric diagnostic overview
• Configuring the fabric – Performance Manager
• Setting traps, events, and alarms
• Logs
• Absent/Disconnected elements
• Additional tools and examples
• Diagnostic utilities
• Configuring the Cluster Monitor
• Fabric diagnostics suggestions
• CLI commands reference
• Port counters fields
• Supported traps and events
22