Site Preparation Guide - HP Integrity BL60p Server Blade

General Site Preparation Guidelines
Environmental Elements
Chapter 2
14
Environmental Elements
The following environmental elements can affect the HP Integrity BL60p server blade installation:
Computer room preparation
Cooling requirements
Humidity level
Air conditioning ducts
Dust and pollution control
Electrostatic discharge (ESD) prevention
Acoustics (noise reduction)
Computer Room Preparation
The following guidelines are recommended when preparing a computer room for installation of a server blade:
Locate the computer room away from the exterior walls of the building to avoid the heat gain from
windows and exterior wall surfaces
When exterior windows are unavoidable, use windows that are double- or triple-glazed and shaded to
prevent direct sunlight from entering the computer room
Maintain the computer room at a positive pressure relative to surrounding spaces
Use a vapor barrier installed around the entire computer room envelope to restrain moisture migration
Caulk and vapor seal all pipes and cables that penetrate the envelope
Use at least a 30 cm (12 in.) raised floor system for minimum favorable room air distribution system
(underfloor distribution)
Ensure a minimum clearance of 30 cm (12 in.) between the top of the server cabinet and the ceiling to
allow for return air flow and ensure that all ceiling tiles are in place
Allow 46 cm (18 in. [or local code minimum clearance]) from the top of the server cabinet to the fire
sprinkler heads
Cooling Requirements
Air conditioning equipment requirements and recommendations are described in the following sections.
Basic Air Conditioning Equipment Requirements
The cooling capacity of the installed air conditioning equipment for the computer room should be sufficient to
offset the computer equipment dissipation loads, as well as any space envelope heat gain. This equipment
should include:
Air filtration
Cooling or dehumidification
Humidification
Reheating