General Site Preparation Guidelines
Sample Site Inspection Checklist
Chapter 3
40
8. Is the raised floor adequate for equipment loading?
9. Are there channels, cutouts or overhead cable trough(s) for
cable routing?
10. Is a telephone line available for servicing needs?
11. Are customer supplied peripheral cables and LAN cables
available and of the proper type?
12. Is floor tile underside shiny or painted? If painted, judge
the need for metallic particulate test.
Power and lighting
No. Area or condition Yes No
13. Are lighting levels adequate for maintenance?
14. Does the DC input voltage correspond to equipment
specifications?
14A Is dual source DC power used? If so, identify type(s) and
evaluate grounding.
15. Is a NEBS compliant DC power source available?
16. Is there a dedicated branch circuit for equipment?
17. Are the input circuit breakers adequate for equipment
loads?
Safety
No. Area or condition Yes No
18. Is there an emergency power shut-off switch?
19. Is there a telephone available for emergency purposes?
20. Is there a fire protection system in the computer room?
21. Is antistatic flooring installed?
22. Are there any equipment servicing hazards (loose ground
wires, poor lighting, and so on)?
Cooling
No. Area or condition Yes No
23. Can cooling be maintained between 5
°C and 40°C (up to
5,000 ft)? Derate 1
°C/1,000 ft above 5,000 ft and up to
10,000 ft.
Table 3-5 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date Comment or Date