Site Preparation Guide, Third Edition - HP Integrity cx2600
General Site Preparation Guidelines
Sample Site Inspection Checklist
Chapter 3
41
24. Can temperature changes be held to 10°C per hour with
tape media? Can temperature changes be held to 20
°C per
hour without tape media?
25. Can humidity level be maintained at 40% to 55% (non
condensing)?
26. Are air conditioning filters installed and clean?
Storage
No. Area or condition Yes No
27. Are cabinets available for tape and disc media?
28. Is shelving available for documentation?
Training
No. Area or Condition Yes No
29. Are personnel enrolled in the System Administrator’s
Course?
30. Is on-site training required?
Table 3-5 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date Comment or Date