Installation Guide, Second Edition - HP Integrity cx2620

IMPORTANT: Inspect each carton for shipping damage as you unpack the server.
Checking the Inventory
The sales order packing slip lists all of the equipment shipped from HP. Use this packing slip to
verify that all of the equipment has arrived.
NOTE: To identify each item by part number, see the sales order packing slip.
Returning Damaged Equipment
If the equipment is damaged, contact your HP customer service representative immediately. The
service representative initiates appropriate action through the transport carrier or the factory
and assists you in returning the equipment.
Unloading the Server with a Lifter
WARNING! Use caution when using a lifter. Because of the weight of the server, you must
center the server on the lifter forks before lifting it off the pallet to avoid injury.
To unload the server from the pallet using a lifter, follow these steps:
1. Unpack the server.
2. Unroll the bottom corrugated tray corresponding to the side on which the lifter will be
placed, and slide the server as close to that edge of the pallet as possible.
3. Break off any foam packaging which could prevent the lifter from being fully inserted under
the server. Do not remove the foam packaging from the corners of the server. This foam is
required to elevate the server and enable the forks of the lifter to be placed under the server.
4. Insert the lifter forks under the server.
5. Carefully roll the lifters forward until it is fully positioned against the side of the server.
6. Slowly raise the server off the pallet until it clears the pallet cushions.
7. Carefully roll the lifter and server away from the pallet. Do not raise the server any higher
than necessary when moving it over to the rack.
Installing Additional Components
This section describes how to install server components that are not installed before delivery.
This section addresses the following topics:
“Required Service Tools” (page 21)
Accessing a Rack-Mounted Server” (page 21)
“Installing Hot-Pluggable Disk Drives” (page 22)
“Installing Hot-Swappable Power Supply Units” (page 23)
“Installing the Front Grill and Top Cover” (page 25)
“Installing Hot-Swappable Chassis Fan Units” (page 27)
“PCI-X Card Installation” (page 29)
“Installing Single-Core Processors” (page 32)
“Installing Dual-Core Processors” (page 38)
“Installing Memory” (page 41)
20 Installing the System