Site Preparation Guide, Second Edition - HP Integrity cx2620 Server
Table 2-6 Site Inspection Checklist (continued)
Comment or DatePlease check either Yes or No. If No, include comment# or date
Are there dc outlets available for servicing needs? (for example,
vacuuming)
14.
Does the input voltage correspond to equipment specifications?15.
Is dual source power used? If so, identify type(s) and evaluate
grounding.
15A
Does the input frequency correspond to equipment specifications?16
Are lightning arrestors installed inside the building?17.
Is power conditioning equipment installed?18.
Is there a dedicated branch circuit for equipment?19.
Is the dedicated branch circuit less than 250 feet (72.5 meters)?20.
Are the input circuit breakers adequate for equipment loads?21.
Safety
NoYesArea or conditionNo.
Is there an emergency power shut-off switch?22.
Is there a telephone available for emergency purposes?23.
Is there a fire protection system in the computer room?24.
Is antistatic flooring installed?25.
Are there any equipment servicing hazards (loose ground wires,
poor lighting, and so on)?
26.
Cooling
NoYesArea or conditionNo.
Can cooling be maintained between 20° C and 55° C (up to 5,000
ft.)? Derate 1° C/1,000 ft. above 5,000 ft. and up to 10,000 ft.
27.
Can temperature changes be held to 10° C per hour with tape
media? Can temperature changes be held to 20° C per hour without
tape media?
28.
Can humidity level be maintained at 40% to 60% at 35° C
noncondensing?
29.
Are air conditioning filters installed and clean?30.
Storage
NoYesArea or conditionNo.
Are cabinets available for tape and disc media?31.
Is shelving available for documentation?32.
Training
Area or ConditionNo.
Are personnel enrolled in the System Administrator’s Course?33
Is on-site training required?34
Sample Site Inspection Checklist 45