Site Preparation Guide, Second Edition - HP Integrity cx2620 Server

Delivery Survey
The delivery survey forms list delivery or installation requirements. If any of the items on the
list apply, enter the appropriate information in the areas provided on the form.
Special instructions or recommendations should be entered on the special instructions or
recommendations form. The following list gives examples of special instructions or issues:
Packaging restrictions at the facility, such as size and weight limitations
Special delivery procedures
Special equipment required for installation, such as tracking or hoists
What time the facility is available for installation (after the equipment is unloaded)
Special security requirements applicable to the facility, such as security clearance
Figure 2-13 Delivery Survey (Part 1)
DELIVERY CHECKLIST
DOCK DELIVERY
Is dock large enough for a semitrailer? Yes ___________ No ___________
Circle the location of the dock and give street name if different than address.
West
South
North
East
STREET DELIVERY
List special permits (if required) for street delivery.
List height ___________ and width ___________ of access door.
Circle the location of access door and list street name if different than address.
West
South
North
East
Permit type:
______________________________________
______________________________________
Agency obtained from:
______________________________________
______________________________________
46 General Site Preparation Guidelines