Site Preparation Guide, Second Edition - HP Integrity cx2620 Server

Index
A
air conditioning
ducts, 35
equipment requirements, 33
system recommendations, 34
air distribution system
above ceiling, 35
ceiling plenum, 34
room space return air, 34
underfloor, 34
B
branch circuit protection, 16
C
CFM, 18
circuit breaker, 16
computer room safety, fire protection, 23
cooling requirements, 33
D
data communications cables, 29
dc source and main dc power disconnect, 15
disconnect device, 16
ducts, air conditioning, 35
E
electrical and environmental guidelines
air distribution system, 34
computer equipment grounds, 27
computer room safety, fire protection, 23
electrical conduit ground, 27
grounding systems, 26
lighting requirements, 24
main building electrical ground, 27
power distribution safety grounding, 26
power panel grounds, 27
power quality, 25
power quality, sources of electrical disturbances, 25
system installation guidelines, 29
electrical specifications, 14
environmental elements, 31
acoustics, 36
air conditioning equipment requirements, 33
air conditioning recommendations, 33
air distribution systems, 34
computer room considerations, 31
cooling requirements, 33
electrostatic discharge
prevention, 35
humidity level, 35
static protection measures, 36
F
facility guidelines
characteristics, 36
floor loading terms, 36
floor-plan grid, 39
typical raised floor site, 37
windows, 38
fire protection, 23
floor loading, raised floor, 37
G
grounding systems, electrical conduit ground, 27
H
humidity level, 35
I
installation schedule, 43
K
Keystone system
temperature and humidity specifications, 17
keystone system
environmental elements, 31
power system protection, 25
typical installation schedule, 43
M
main building electrical ground, 27
N
noise emission specifications, 19
P
physical and environmental specifications, 49
power
consumption, 24
distribution hardware, 26
distribution safety grounding, 26
quality, 25
system protection, 25
R
raised floor, ground system, 28
S
sources of electrical disturbances, 25
space requirements, delivery, 38
system installation guidelines, 29
data communications cables, 29
wiring connections, 29
T
temperature and humidity specifications, 17
W
wiring, connections, 29
53