User Service Guide, Third Edition - HP Integrity cx2620 Server

Figure 3-20 Connect the Power Module Cable
19. Place the processor airflow guide in position.
20. Install the chassis top cover. See “Installing the Top Cover” (page 64).
21. If necessary, reinstall the chassis in the rack. See “Install the Server into a Rack” (page 60).
22. Reconnect power and system cables to rear panel connectors.
23. Turn on the system.
24. Run the info cpu command at the EFI Shell prompt to verify that the processor has been
installed correctly.
Installing Dual-Core Processors
The system board can support either one or two dual-core processors. The following procedure
is applicable to installation of CPU 0 or CPU 1. CPU 0 is located closer to the chassis side panel
and CPU 1 is located closer to the DIMM sockets. You must install CPU 0 before installing CPU
1.
The server may be delivered with one or two dual-core processors installed. You can install the
second processor, or replace the processors with newer, compatible processors. The following
sections provide detailed procedures for processor installation.
76 Installing the System