Expand Configuration and Management Manual (H06.03+)
Contents
Expand Configuration and Management Manual—529522-002
v
8. Configuring Expand-Over-IP Lines (continued)
8. Configuring Expand-Over-IP Lines (continued)
Step 1 (A): Select a Process and SUBNET for NonStop TCP/IP Use 8-9
Select a NonStop TCP/IP Process 8-9
Select a SUBNET for NonStop TCP/IP 8-9
Creating an Ethernet SUBNET or ATM SUBNET 8-10
Step 1 (B): Select a Process and SUBNET for NonStop TCP/IPv6 Use 8-11
Select a SUBNET for NonStop TCP/IPv6 Use 8-11
Select a TCP6SAM Process 8-13
Creating an Ethernet Subnet 8-14
Step 2 (A): Identify an Available UDP Port Number 8-14
Step 2 (B): Identify an Available UDP Port Number for TCP/IPv6 Use 8-15
Step 3: Create a Profile for the Line-Handler Process 8-17
ADD Profile Command 8-17
Example 8-18
Step 4: Create the Line-Handler Process 8-18
ADD DEVICE Command 8-18
Considerations 8-21
Step 5: Start the Line-Handler Process 8-22
Step 6: Start the Line 8-23
Add a Configured Tunnel for an Expand Line 8-23
Profile Modifiers 8-25
Recommended Modifiers 8-25
Modifiers for Special Features 8-26
PEXQSIP Modifiers 8-26
9. Configuring Expand-Over-ATM Lines
Required Hardware and Software 9-2
QIO Subsystem 9-2
ATM Subsystem 9-3
SLSA Subsystem 9-3
ATM 3 ServerNet Adapter (ATM3SA) 9-3
Topology Considerations 9-4
Summary of Configuration Steps 9-5
Step 1: Identify the ATM Connection 9-5
Configuring an Expand Line-Handler Process That Uses a PVC 9-6
Configuring an Expand Line-Handler Process That Uses an SVC 9-6
Configuring an Expand Line-Handler Process That Uses ATMSAP 9-9










