L700 (CTL700) Installation and User's Guide (G06.28+, H06.04+, J06.03+)

Table Of Contents
L700 (CTL700) Installation and Users Guide527338-008
Index-1
Index
A
AC power distribution units 1-3
Alignment pins 3-3
B
Backup and restore 9-7
C
Cable routing (diagram) 2-3
Cables 3-7
Cartridge access port 1-1, 6-1
Compression 9-12
Configuration
PMF CRU 8-3
ServerNet/DA 8-2
tape drive 8-2
Configuring considerations 9-17
Control 8-2
CTL700 unpacking 2-4
D
DC power supplies 1-3
F
Fibre channel to SCSI router
configuration
Lun mapping table A-2
SCF command A-2
Foam packing 2-9
H
Hand assembly 2-9
I
Installing
cables 3-7
SCSI cable paths 3-7
SCSI control connection 3-7
post installation 3-12
power cables 3-10
SCSI drive connections 3-9
L
Labeled-tape processing 9-11
Leveling bolts 3-3
M
MEDIACOM utility 9-10
MPC card 3-7
MPC controller card 3-6
N
NonStop NS-series server A-1
Nonstop S-series server 8-1
O
Operating positions 3-6
P
Power
connecting 3-11
Power cables 3-10
routing 3-10
R
Required tools 2-1
S
SCF
bringing down a tape drive 9-5