NonStop NS-Series Operations Guide (H06.03+)
Table Of Contents
- What’s New in This Manual
- About This Guide
- 1 Introduction to Integrity NonStop NSSeries Operations
- When to Use This Section
- Understanding the Operational Environment
- What Are the Operator Tasks?
- Monitoring the System and Performing Recovery Operations
- Preparing for and Recovering from Power Failures
- Stopping and Powering Off theSystem
- Powering On and Starting the System
- Creating Startup and Shutdown Files
- Performing Preventive Maintenance
- Operating Disk Drives and Tape Drives
- Responding to Spooler Problems
- Updating Firmware
- Determining the Cause of a Problem: A Systematic Approach
- Logging On to an Integrity NonStop Server
- Service Procedures
- 2 Determining Your System Configuration
- 3 Overview of Monitoring and Recovery
- 4 Monitoring EMS Event Messages
- 5 Processes: Monitoring and Recovery
- 6 Communications Subsystems: Monitoring and Recovery
- 7 ServerNet Resources: Monitoring and Recovery
- 8 I/O Adapters and Modules: Monitoring and Recovery
- 9 Processors and Components: Monitoring and Recovery
- When to Use This Section
- Overview of the NonStop Blade Complex
- Monitoring and Maintaining Processors
- Identifying Processor Problems
- Recovery Operations for Processors
- Recovery Operations for a Processor Halt
- Halting One or More Processors
- Reloading a Single Processor on a Running Server
- Recovery Operations for a System Hang
- Enabling/Disabling Processor and System Freeze
- Freezing the System and Freeze-Enabled Processors
- Dumping a Processor to Disk
- Backing Up a Processor Dump to Tape
- Replacing Processor Memory
- Replacing the Processor Board and Processor Entity
- Submitting Information to Your Service Provider
- Related Reading
- 10 Disk Drives: Monitoring and Recovery
- 11 Tape Drives: Monitoring and Recovery
- 12 Printers and Terminals: Monitoring and Recovery
- 13 Applications: Monitoring and Recovery
- 14 Power Failures: Preparation and Recovery
- 15 Starting and Stopping the System
- When to Use This Section
- Powering On a System
- Starting a System
- Minimizing the Frequency of Planned Outages
- Stopping Application, Devices, and Processes
- Stopping the System
- Powering Off a System
- Troubleshooting and Recovery Operations
- Fans Are Not Turning
- System Does Not Appear to Be Powered On
- Green LED Is Not Lit After POSTs Finish
- Amber LED on a Component Remains Lit After the POST Finishes
- Components Fail When Testing the Power
- Recovering From a System Load Failure
- Getting a Corrupt System Configuration File Analyzed
- Recovering From a Reload Failure
- Exiting the OSM Low-Level Link
- Opening Startup Event Stream and Startup TACL Windows
- Related Reading
- 16 Creating Startup and Shutdown Files
- Automating System Startup and Shutdown
- Processes That Represent the System Console
- Example Command Files
- CIIN File
- Writing Efficient Startup and Shutdown Command Files
- How Process Persistence Affects Configuration and Startup
- Tips for Startup Files
- Startup File Examples
- Tips for Shutdown Files
- Shutdown File Examples
- 17 Preventive Maintenance
- A Operational Differences Between Systems Running GSeries and HSeries RVUs
- B Tools and Utilities for Operations
- When to Use This Appendix
- BACKCOPY
- BACKUP
- Disk Compression Program (DCOM)
- Disk Space Analysis Program (DSAP)
- EMSDIST
- Event Management Service Analyzer (EMSA)
- File Utility Program (FUP)
- Measure
- MEDIACOM
- NonStop NET/MASTER
- NSKCOM and the Kernel-Managed Swap Facility (KMSF)
- OSM Package
- PATHCOM
- PEEK
- RESTORE
- SPOOLCOM
- Subsystem Control Facility (SCF)
- HP Tandem Advanced Command Language (TACL)
- TMFCOM
- Web ViewPoint
- ViewPoint
- ViewSys
- C Related Reading
- D Converting Numbers
- Safety and Compliance
- Index

Power Failures: Preparation and Recovery
HP Integrity NonStop NS-Series Operations Guide—529869-001
14-4
Monitor Batteries
Monitor Batteries
•
Monitoring site UPS batteries is the responsibility of the customer. OSM does not
interface with a site UPS or batteries.
•
Monitoring batteries in an internal UPS and ERM is performed using OSM.
•
Monitor batteries in I/O enclosures using OSM. For more information on battery
attributes and actions, see the OSM Service Connection online help.
Maintain Batteries
Make sure that all installed batteries and spare batteries are always fully charged.
Correct any problems that are causing the batteries to become drained.
In general, batteries are constantly charging when AC power is available to a system.
When recovering from a power failure event, it will take time for the batteries to be fully
charged. For different kinds of batteries:
•
Maintenance and charging of site UPS batteries is the responsibility of the
customer.
•
Information about maintenance and charging of batteries in an optional internal
UPS and ERM is located in documentation that comes with the products.
•
Information about maintenance and charging of batteries in I/O enclosures is
located in the CSSI Web for NonStop S-series servers. Spare batteries for I/O
enclosures require charging every six months.
Power Failure Recovery
After a power failure, if AC power is restored to a NonStop NS-series server while the
batteries are still holding up the system, it will not be necessary to restart the system.
Resume operations.
Depending on the configuration of UPS resources, power failure can last long enough
to leave the system with some processors down because the batteries were drained to
the point where the processors can no longer operate. In conjunction with an internal
UPS, a homogeneous power off can be configured to avoid this condition.
If the power failure lasts long enough to drain the batteries completely, the system
Power/Fail should stop the system. When power is restored, the operator must then
restart the system.










