NonStop NS-Series Operations Guide (H06.03+)
Table Of Contents
- What’s New in This Manual
- About This Guide
- 1 Introduction to Integrity NonStop NSSeries Operations
- When to Use This Section
- Understanding the Operational Environment
- What Are the Operator Tasks?
- Monitoring the System and Performing Recovery Operations
- Preparing for and Recovering from Power Failures
- Stopping and Powering Off theSystem
- Powering On and Starting the System
- Creating Startup and Shutdown Files
- Performing Preventive Maintenance
- Operating Disk Drives and Tape Drives
- Responding to Spooler Problems
- Updating Firmware
- Determining the Cause of a Problem: A Systematic Approach
- Logging On to an Integrity NonStop Server
- Service Procedures
- 2 Determining Your System Configuration
- 3 Overview of Monitoring and Recovery
- 4 Monitoring EMS Event Messages
- 5 Processes: Monitoring and Recovery
- 6 Communications Subsystems: Monitoring and Recovery
- 7 ServerNet Resources: Monitoring and Recovery
- 8 I/O Adapters and Modules: Monitoring and Recovery
- 9 Processors and Components: Monitoring and Recovery
- When to Use This Section
- Overview of the NonStop Blade Complex
- Monitoring and Maintaining Processors
- Identifying Processor Problems
- Recovery Operations for Processors
- Recovery Operations for a Processor Halt
- Halting One or More Processors
- Reloading a Single Processor on a Running Server
- Recovery Operations for a System Hang
- Enabling/Disabling Processor and System Freeze
- Freezing the System and Freeze-Enabled Processors
- Dumping a Processor to Disk
- Backing Up a Processor Dump to Tape
- Replacing Processor Memory
- Replacing the Processor Board and Processor Entity
- Submitting Information to Your Service Provider
- Related Reading
- 10 Disk Drives: Monitoring and Recovery
- 11 Tape Drives: Monitoring and Recovery
- 12 Printers and Terminals: Monitoring and Recovery
- 13 Applications: Monitoring and Recovery
- 14 Power Failures: Preparation and Recovery
- 15 Starting and Stopping the System
- When to Use This Section
- Powering On a System
- Starting a System
- Minimizing the Frequency of Planned Outages
- Stopping Application, Devices, and Processes
- Stopping the System
- Powering Off a System
- Troubleshooting and Recovery Operations
- Fans Are Not Turning
- System Does Not Appear to Be Powered On
- Green LED Is Not Lit After POSTs Finish
- Amber LED on a Component Remains Lit After the POST Finishes
- Components Fail When Testing the Power
- Recovering From a System Load Failure
- Getting a Corrupt System Configuration File Analyzed
- Recovering From a Reload Failure
- Exiting the OSM Low-Level Link
- Opening Startup Event Stream and Startup TACL Windows
- Related Reading
- 16 Creating Startup and Shutdown Files
- Automating System Startup and Shutdown
- Processes That Represent the System Console
- Example Command Files
- CIIN File
- Writing Efficient Startup and Shutdown Command Files
- How Process Persistence Affects Configuration and Startup
- Tips for Startup Files
- Startup File Examples
- Tips for Shutdown Files
- Shutdown File Examples
- 17 Preventive Maintenance
- A Operational Differences Between Systems Running GSeries and HSeries RVUs
- B Tools and Utilities for Operations
- When to Use This Appendix
- BACKCOPY
- BACKUP
- Disk Compression Program (DCOM)
- Disk Space Analysis Program (DSAP)
- EMSDIST
- Event Management Service Analyzer (EMSA)
- File Utility Program (FUP)
- Measure
- MEDIACOM
- NonStop NET/MASTER
- NSKCOM and the Kernel-Managed Swap Facility (KMSF)
- OSM Package
- PATHCOM
- PEEK
- RESTORE
- SPOOLCOM
- Subsystem Control Facility (SCF)
- HP Tandem Advanced Command Language (TACL)
- TMFCOM
- Web ViewPoint
- ViewPoint
- ViewSys
- C Related Reading
- D Converting Numbers
- Safety and Compliance
- Index

Starting and Stopping the System
HP Integrity NonStop NS-Series Operations Guide—529869-001
15-2
When to Use This Section
Recovering From a Reload Failure on page 15-21
Exiting the OSM Low-Level Link on page 15-22
Opening Startup Event Stream and Startup TACL Windows on page 15-22
Related Reading on page 15-24
When to Use This Section
Normally, you leave a system running. However, some procedures or recovery actions
require you to start the system (perform a system load) or stop or power off the
system.
•
Stop and then power off a system before:
°
An extended planned power outage for your building or computer room.
°
Performing some major maintenance or repair operations as noted in the
documentation.
•
Stop or restart a system (without powering off) when:
°
Installing an updated RVU or some software product revisions (SPRs).
°
Performing some recovery operations as noted in the documentation.
°
Restarting the system after the entire system has been shut down with the
operating system images and files on disk still intact.
Powering On a System
Powering on a system delivers AC power to the system cabinets. Fans on the
processor switches, processor slices, IOAM enclosures, and disk drive enclosures start
turning, and air begins to circulate through the components. After the fans start to
operate, most other system components begin to power on.
Status light-emitting diodes (LEDs) on the system components light during a series of
power-on self-tests (POSTs). Any of the LEDs can become lit briefly during the
POSTs. After all the POSTs finish successfully, which might take up to 10 minutes,
only the green power-on LED on each component in the system enclosures should
remain lit. For more information about the LEDs, refer to Using the Status LEDs to
Monitor the System on page 3-20.
The method you use to power on the system depends on whether the system is in a
low power state or completely powered off:
•
Powering On the System From a Low Power State on page 15-3
•
Powering On the System From a No Power State on page 15-3










