NonStop NS-Series Operations Guide (H06.03+)
Table Of Contents
- What’s New in This Manual
- About This Guide
- 1 Introduction to Integrity NonStop NSSeries Operations
- When to Use This Section
- Understanding the Operational Environment
- What Are the Operator Tasks?
- Monitoring the System and Performing Recovery Operations
- Preparing for and Recovering from Power Failures
- Stopping and Powering Off theSystem
- Powering On and Starting the System
- Creating Startup and Shutdown Files
- Performing Preventive Maintenance
- Operating Disk Drives and Tape Drives
- Responding to Spooler Problems
- Updating Firmware
- Determining the Cause of a Problem: A Systematic Approach
- Logging On to an Integrity NonStop Server
- Service Procedures
- 2 Determining Your System Configuration
- 3 Overview of Monitoring and Recovery
- 4 Monitoring EMS Event Messages
- 5 Processes: Monitoring and Recovery
- 6 Communications Subsystems: Monitoring and Recovery
- 7 ServerNet Resources: Monitoring and Recovery
- 8 I/O Adapters and Modules: Monitoring and Recovery
- 9 Processors and Components: Monitoring and Recovery
- When to Use This Section
- Overview of the NonStop Blade Complex
- Monitoring and Maintaining Processors
- Identifying Processor Problems
- Recovery Operations for Processors
- Recovery Operations for a Processor Halt
- Halting One or More Processors
- Reloading a Single Processor on a Running Server
- Recovery Operations for a System Hang
- Enabling/Disabling Processor and System Freeze
- Freezing the System and Freeze-Enabled Processors
- Dumping a Processor to Disk
- Backing Up a Processor Dump to Tape
- Replacing Processor Memory
- Replacing the Processor Board and Processor Entity
- Submitting Information to Your Service Provider
- Related Reading
- 10 Disk Drives: Monitoring and Recovery
- 11 Tape Drives: Monitoring and Recovery
- 12 Printers and Terminals: Monitoring and Recovery
- 13 Applications: Monitoring and Recovery
- 14 Power Failures: Preparation and Recovery
- 15 Starting and Stopping the System
- When to Use This Section
- Powering On a System
- Starting a System
- Minimizing the Frequency of Planned Outages
- Stopping Application, Devices, and Processes
- Stopping the System
- Powering Off a System
- Troubleshooting and Recovery Operations
- Fans Are Not Turning
- System Does Not Appear to Be Powered On
- Green LED Is Not Lit After POSTs Finish
- Amber LED on a Component Remains Lit After the POST Finishes
- Components Fail When Testing the Power
- Recovering From a System Load Failure
- Getting a Corrupt System Configuration File Analyzed
- Recovering From a Reload Failure
- Exiting the OSM Low-Level Link
- Opening Startup Event Stream and Startup TACL Windows
- Related Reading
- 16 Creating Startup and Shutdown Files
- Automating System Startup and Shutdown
- Processes That Represent the System Console
- Example Command Files
- CIIN File
- Writing Efficient Startup and Shutdown Command Files
- How Process Persistence Affects Configuration and Startup
- Tips for Startup Files
- Startup File Examples
- Tips for Shutdown Files
- Shutdown File Examples
- 17 Preventive Maintenance
- A Operational Differences Between Systems Running GSeries and HSeries RVUs
- B Tools and Utilities for Operations
- When to Use This Appendix
- BACKCOPY
- BACKUP
- Disk Compression Program (DCOM)
- Disk Space Analysis Program (DSAP)
- EMSDIST
- Event Management Service Analyzer (EMSA)
- File Utility Program (FUP)
- Measure
- MEDIACOM
- NonStop NET/MASTER
- NSKCOM and the Kernel-Managed Swap Facility (KMSF)
- OSM Package
- PATHCOM
- PEEK
- RESTORE
- SPOOLCOM
- Subsystem Control Facility (SCF)
- HP Tandem Advanced Command Language (TACL)
- TMFCOM
- Web ViewPoint
- ViewPoint
- ViewSys
- C Related Reading
- D Converting Numbers
- Safety and Compliance
- Index
Starting and Stopping the System
HP Integrity NonStop NS-Series Operations Guide—529869-001
15-19
System Does Not Appear to Be Powered On
System Does Not Appear to Be Powered On
If AC power is being supplied to the server and the fans are turning but the server still
does not appear to be powered, the server might be running internal tests. Wait
several minutes (at least 10 minutes for large configurations). If the server is still not
powered on after this time and you cannot determine the cause of the problem:
•
Check your site’s circuit breakers.
•
Plug in another device into the PDU that powers the LSU to check the power for
that PDU.
Green LED Is Not Lit After POSTs Finish
It can take several minutes for the green LEDs on all system components to light:
1. Wait for the POSTs to finish. It might take as long as 10 minutes for all system
components.
2. If the green LEDs still do not light:
a. Check that AC power cords and component power cords are properly
connected.
b. If one green LED still does not light, a system component might have failed its
POST.
3. If you cannot determine the cause of the problem, contact your service provider.
Amber LED on a Component Remains Lit After the POST
Finishes
A fault might have been detected, or the component might not have been successfully
initialized and configured. Contact your service provider.
Components Fail When Testing the Power
If a component fails when testing the power, the possible causes are listed in
descending order of probability:
•
The component is plugged in improperly.
Check the connection between each component power cord and PDU, and check
the AC power receptacle to which the server power cord is connected. If
necessary, unplug and plug each cord in again to ensure that it is seated properly.
•
A power cord is defective.
•
A component power supply is defective.
•
A fuse is defective.
•
The UPS, if installed, is not fully charged.










