NonStop NS-Series Planning Guide (H06.03+)
System Installation Planning
HP Integrity NonStop NS-Series Planning Guide—529567-004
7-15
Building Access, Security, and Equipment Delivery
Building Access, Security, and Equipment Delivery
Section G: Building Access, Security &
Equipment Delivery
Yes No RISK
G-1 Is there security or access control for the customer site? ? ? ?
G-2 Is there security or access control for the computer room? ? ? ?
G-3 Are there any restrictions for bringing laptops, electronic
tools, cell phones, cameras into the computer room?
? ? ?
G-4 Are there any restrictions on delivery truck length, width
or height?
? ? ?
G-5 Does the building have a delivery dock and adequate
receiving area?
• (loading dock, front or rear walkway entrance,
large enough for pallet jack to move pallet)
? ? ?
G-6 Is there a delivery/unpacking/staging area?
• (specific products might require 120 sq feet of area)
? ? ?
G-7 Is the unpacking/staging area air-conditioned?
• (see product spec. Thermal shock can result in
extreme circumstances)
? ? ?
G-8 Is the delivery dock a standard raised dock or does it have
automatic leveler?
? ? ?
G-9 Is inside delivery required? ? ? ?
G-10 Does receiving dock require union labor? ? ? ?
G-11 Will appropriate moving personnel be available? ? ? ?
G-12 Is uncrating of cabinet and cabinet trash removal
required?
? ? ?
G-13 Does the customer’s receiving department have an
incoming inspection process?
? ? ?
G-14 Does customer need to have complete trash removal 1 or 2
days after install?
• (note: this is initiated by installation CE after
delivery)
? ? ?
G-15 Does the customer allow cardboard boxes and/or other
packing material in the computer room?
? ? ?
G-16 Will any stair walkers, lifters, ramps, steel plates or floor
covers be required to place the equipment in the computer
room?
? ? ?
G-17 Are elevators available to handle equipment loading?
• (see product specifications)
? ? ?
VST042.vsd