NonStop NS-Series Planning Guide (H06.03+)
HP Integrity NonStop NS-Series Planning Guide—529567-004
Index-1
Index
A
AC power
208 V ac delta 4-35, A-1
250 V ac 3-phase 4-36, A-1
250 V ac single-phase 4-37, A-1
enclosure input specifications A-2
power-fail monitoring 5-14
power-fail states 5-15
unstrapped PDU 4-34
AC power failure 8-6
AC power feed 2-5
bottom of cabinet 2-5
top of cabinet 2-5
with cabinet UPS 2-6
access readiness inspection 7-15
air conditioning
power-fail 8-6
readiness inspection 7-12
alternate system disk 8-7
appraisal, site readiness 7-4
availability, how measured 8-2
B
Blade Complex 1-3
Blade Element 1-3, 2-8
branch circuit A-2
C
cabinet 2-28
cabinet dimensions, A-4
cabinet, offset 2-4
cable connections
LSUs to p-switches 4-8
slice to LSUs 4-7
cable labeling 4-4
cable length restrictions 4-7
cable management system (CMS) 2-25
cable specifications 4-6
cable verifier 5-13
cabling
FCSA to disk drive enclosure 4-24
FCSA to tape devices 4-15
processors 0 to 3 4-9
processors 12 to 15 4-12
processors 4 to 7 4-10
processors 8 to 11 4-11
p-switch to NonStop S-series I/O
enclosure 4-15
p-switches to IOAM enclosure 4-13
restrictions 4-13
clearances, service A-4
cluster cable product IDs 2-25
communication readiness inspection 7-18
complex
NonStop Blade 1-3
processor description 1-3
processor ID 2-9, 2-15
computer room readiness inspection 7-6
configuration considerations
Fibre Channel devices 4-21
IOAM enclosures 4-19
minimum, typical’ maximum number of
enclosures B-1
configuration examples B-1
configuration, factory-installed hardware
documentation 7-1
controls, slice front panel 2-10
CSSI Web 5-11
D
daisy-chain disk configuration
recommendations 4-23
dedicated maintenance LAN 5-8
default disk drive locations 4-21
default startup characteristics 1-13










