NonStop NS-Series Planning Guide (H06.03+)
Index
HP Integrity NonStop NS-Series Planning Guide—529567-004
Index-3
G
Fibre Channel ServerNet adapter
(FCSA) 2-19
floor plan grid form 7-19
forms
floor plan grid 7-19
ServerNet adapter configuration 7-3
site prep walk-through inspection 7-5
front panel, slice
buttons 2-10
indicator LEDs 2-11
FRU
AC power assembly, LSU 2-11
disk drive enclosure 2-21
fan
IOAM enclosure 2-17
p-switch 2-13
slice 2-8
I/O interface board 2-8
logic board, LSU 2-11
memory board 2-8
optic adapter
LSU 2-11
slice 2-8
power supply 2-8, 2-14
processor board 2-8
reintegration board 2-8
replacement planning 8-6
replacement tools 5-15
replacement, ServerNet
considerations 8-7
fuses, PDU 2-5
G
G4SA
maintenance LAN PIF 6-7
network connections 4-31
Gigabit Ethernet 4-port ServerNet adapter
(G4SA) 2-20
GMS
disk drive enclosure 2-34
IOAM enclosure 2-33
LSU 2-31
processor 2-29
p-switch 2-32
group 2-28
group, NonStop S-series I/O
enclosure 2-36
group-module-slot (GMS) 2-28
H
hardware configurations, typical B-2
height in U, enclosures A-5
HSM CD 5-11
I
indicator LEDs
LSU front panel 2-13
p-switch 2-15
slice front panel 2-11
installation
readiness inspection, pre-
installation 7-4
installation planning 7-1
internal cable product IDs 2-24
internal interconnect cabling 4-5
internal ServerNet cabling B-21
IOAM
configuration considerations 4-19
enclosure 2-17
FCSA 2-19
FRUs 2-17
G4SA 2-20
ME firmware 5-7
ServerNet pathways 3-3, 3-4
IOMF 2 CRU 2-36
IP addresses
components connected to LAN 6-3
dynamic 6-5
static 6-5
I/O functional element 5-7










