NonStop NS-Series Planning Guide (H06.03+)
Index
HP Integrity NonStop NS-Series Planning Guide—529567-004
Index-6
S
Fibre Channel device
configuration 4-22
p-switch cabling 4-13
router
system pathways 3-5
routers, ServerNet 3-3
S
safety ground/protective earth A-2
safety readiness inspection 7-11
security readiness inspection 7-15
ServerNet
16-processor complex 3-8
architecture 3-3
cable verifier 5-13
fabric 1-4, 3-1
interconnection cabling 4-5
internal cabling B-21
link 3-1
node 3-1
optic cabling 4-4
processor connections 2-15
router 3-1
switch board
IOAM enclosure 2-17
p-switch 2-14
ServerNet fabric 3-1
service clearances A-4
service procedures 5-11
site preparation
walk-through inspection 7-4
site readiness inspection
access, security, delivery 7-15
air conditioning 7-12
communication 7-18
computer room 7-6
EMI and RFI 7-13
power and lighting 7-8
safety 7-11
storage 7-14
slice 1-3, 2-8, 2-28
slot, position 2-28
SMF PIC 2-14
software requirements 4-18
specification
assumptions A-1
cabinet physical A-5, A-6
enclosure dimensions A-6
heat A-7
nonoperating temperature, humidity,
altitude A-8
operating temperature, humidity,
altitude A-7
specifications
cable 4-6
startup characteristics, default 1-13
static IP addresses 6-5
storage readiness inspection 7-14
Subsystem Control Facility (SCF) 5-12
SWAN concentrator
restriction 6-6
synchronization, processor rendezvous 1-8
system console 2-23, 5-1
configurations 6-12
system disk location 1-13
T
tech doc, factory installed hardware 7-2
terminology 2-28
tools, FRU replacement 5-15
triple modular redundant (TMR, triplex)
processor 1-3, 1-7
U
uninterruptible power supply (UPS) 2-22
UPS, HP R5500 XR A-3
W
weight, cabinet and enclosures A-6










