NonStop NS-Series Planning Guide (H06.04+)

Table Of Contents
Index
HP Integrity NonStop NS-Series Planning Guide529567-005
Index-5
Q
PE 4-2
port 5-25
power and thermal calculations 3-11
power consumption 2-3
power distribution units (PDUs) 1-1, 2-1
power failures 2-3
power feed, top or bottom 2-1
power input
Integrity NonStop NS-series server 3-1
power plugs
Integrity NonStop NS-series server 3-2
power quality 2-2
power receptacles, PDU 5-6
power supply
IOAM enclosure 5-16
NonStop Blade Element 5-7
p-switch 5-13
power-fail
monitoring B-21
states B-23
primary and mirror disk drive location
recommendations 6-22
processor
board, FRU 5-7
complex 4-2, 5-25
default numbering 5-26
elements 4-2, 4-4
interconnect cabling 6-7
ME functional element B-8
synchronization, rendezvous 4-7
processor ID 5-8, 5-15
ProCurve 2524 maintenance switch 5-20
p-switch
cabling to IOMA enclosure 6-13
cabling to NonStop S-series I/O
enclosure 6-15
description 5-12
display 5-13
FRUs 5-13
functions 5-13
ME firmware B-7
Q
quad MMF PIC 5-13
R
R5500 XR UPS 5-21
rack 5-24
rack offset 5-24, 5-25
raised flooring 2-5
receive and unpack 2-5
receptacles, PDU 5-6
recovery, failure 4-8
reintegration board 5-7
reintegration, memory 4-8
related manuals
NonStop NS-Series C-1
software migration 4-21
rendezvous 4-7
rendezvous, processor synchronization 4-7
restrictions
cable length 6-6, A-3
cabling NonStop S-series I/O
enclosure 6-17
Fibre Channel device
configuration 6-21
p-switch cabling 6-13
router
system pathways 4-12
routers, ServerNet 4-10
S
safety ground/protective earth 2-3, 3-3
ServerNet
16-processor NonStop Blade
Complex 4-15
architecture 4-10
fabric 4-4
interconnection cabling 6-5
internal cabling 7-10