NonStop NS-Series Planning Guide (H06.04+)
Table Of Contents
- What’s New in This Manual
- About This Manual
- 1 System Hardware Overview
- 2 Installation Facility Guidelines
- 3 System Installation Specifications
- 4 Integrity NonStop NSSeries System Description
- NonStop System Primer
- NonStop Advanced Architecture
- NonStop Blade Complex
- Processor Element
- Duplex Processor
- Triplex Processor
- Processor Synchronization and Rendezvous
- Memory Reintegration
- Failure Recovery for Duplex Processor
- Failure Recovery for Triplex Processor
- ServerNet Fabric I/O
- System Architecture
- Modular Hardware
- NonStop S-Series I/O Hardware
- System Models
- Default Startup Characteristics
- Migration Considerations
- System Installation Document Packet
- 5 Modular System Hardware
- Modular Hardware Components
- Cabinets
- AC Power PDUs
- Modular Cabinet PDU Keepout Panel
- NonStop Blade Element
- Logical Synchronization Unit (LSU)
- LSU Indicator LEDs
- Processor Switch
- P-Switch Indicator LEDs
- Processor Numbering
- I/O Adapter Module (IOAM) Enclosure and I/O Adapters
- Fibre Channel Disk Module
- Tape Drive and Interface Hardware
- Maintenance Switch (Ethernet)
- Optional UPS and ERM
- System Console
- Enterprise Storage System
- Component Location and Identification
- NonStop S-Series I/O Enclosures
- Modular Hardware Components
- 6 System Configuration Guidelines
- Enclosure Locations in Cabinets
- Internal ServerNet Interconnect Cabling
- Cable Labeling
- Cable Management System
- Internal Interconnect Cables
- Dedicated Service LAN Cables
- Cable Length Restrictions
- Internal Cable Part Numbers
- NonStop Blade Elements to LSUs
- NonStop Blade Element to NonStop Blade Element
- LSUs to Processor Switches and Processor IDs
- Processor Switch ServerNet Connections
- Processor Switches to IOAM Enclosures
- FCSA to Fibre Channel Disk Modules
- FCSA to Tape Devices
- P-Switch to NonStop S-Series I/O Enclosure Cabling
- IOAM Enclosure and Disk Storage Considerations
- Fibre Channel Devices
- G4SAs to Networks
- Default Naming Conventions
- PDU Strapping Configurations
- 7 Example Configurations
- A Cables
- B Control, Configuration, and Maintenance Tools
- Support and Service Library
- System Console
- Maintenance Architecture
- Dedicated Service LAN
- IP Addresses
- Ethernet Cables
- SWAN Concentrator Restriction
- System-Up Dedicated Service LAN
- Dedicated Service LAN Links With One IOAM Enclosure
- Dedicated Service LAN Links to Two IOAM Enclosures
- Dedicated Service LAN Links With IOAM Enclosure and NonStop SSeries I/O Enclosure
- Dedicated Service LAN Links With NonStop S-Series I/O Enclosure
- Initial Configuration for a Dedicated Service LAN
- Operating Configurations for Dedicated Service LANs
- OSM
- System-Down OSM Low-Level Link
- AC Power Monitoring
- AC Power-Fail States
- C Guide to Integrity NonStop NSSeries Server Manuals
- Safety and Compliance
- Index

Modular System Hardware
HP Integrity NonStop NS-Series Planning Guide—529567-005
5-5
AC Power PDUs
This illustration shows the location of PDUs for AC from the top of the cabinet when an
optional UPS and ERM are also installed:
This illustration shows the location of PDUs for AC from the bottom of the cabinet when
an optional UPS and ERM are also installed:
08
09
03
04
05
06
07
01
02
08
09
03
04
05
06
07
01
02
Power
Distribution
Unit (PDU)
Uninterruptible
Power Supply
(UPS)
VST120.vsd
PDU
Junction
Box
38
39
40
41
42
37
38
39
40
41
42
37
To AC Power Source
PDU
Junction
Box
Extended Runtime
Module (ERM)
VST153,vsd
08
09
03
04
05
06
07
01
02
08
09
03
04
05
06
07
01
02
Power
Distribution
Unit (PDU)
Uninterruptible
Power Supply
(UPS)
PDU
Junction
Box
38
39
40
41
42
37
38
39
40
41
42
37
To AC Power Source
PDU
Junction
Box
Extended Runtime
Module (ERM)










