NonStop NS-Series Servers Site Preparation (H06.03+)

System Hardware Overview
HP Integrity NonStop NS-Series Site Preparation Guide527836-005
1-2
Hardware Enclosures and Configurations
Each HP modular cabinet includes two power distribution units (PDUs) with junction
boxes and AC power feed cables factory-installed at either the upper or lower rear
corners. Each PDU distributes the AC site power as single phase 200 to 250 V AC to
14 outlets (each with two fuses) for connecting the power cords from the enclosures
mounted in the modular cabinet.
This figure shows an example modular cabinet with a duplex processor and hardware
for a complete system (rear view).
38
39
40
41
42
33
34
35
36
37
28
29
30
31
32
23
24
25
26
27
18
19
20
21
22
13
14
15
16
17
08
09
10
11
12
03
04
05
06
07
01
02
38
39
40
41
42
33
34
35
36
37
28
29
30
31
32
13
14
15
16
17
08
09
10
11
12
03
04
05
06
07
01
02
23
24
25
26
27
18
19
20
21
22
IOAM
Enclosure
Maintenance
Switch
Power
Distribution
Units
(PDUs)
ServerNet Switch
Boards
To AC Power Source or Site UPS
ServerNet
Adapters
PDU
Junction
Boxes
Slice A
Slice B
LSU
Enclosure
P-Switch
X Fabric
P-Switch
Y Fabric
VST421.vsd
Disk Drive Enclosure
(behind junction boxes)
Disk Drive
Enclosure
Console