NonStop NS1000 Planning Guide (H06.05+)
System Installation Specifications
HP Integrity NonStop NS1000 Planning Guide—542527-004
3-5
Dimensions and Weights
Dimensions and Weights
Fibre Channel disk
module
3
2 220 140 280 14
Maintenance switch
(Ethernet)
4
150 - 4
1
Half of the plugs for an enclosure must be connected to the right-side PDU and the other half connected to the
left-side PDU. PDUs must be supplied from separate branch circuits.
2
Measured with 10 Fibre Channel ServerNet adapters installed and active.
3
Measured with 14 disk drives installed and active.
4
Maintenance switch has only one plug. This plug must be connected to the right-side PDU.
5
Total apparent power is the sum of the two AC power lines feeding the enclosure. Electrical load is shared
equally between the two lines.
Topic Page
Plan View of the Modular Cabinet
3-6
Service Clearances for the Modular Cabinet 3-6
Unit Sizes 3-6
Modular Cabinet Physical Specifications 3-7
Enclosure Dimensions 3-7
Modular Cabinet and Enclosure Weights With Worksheet 3-7
Enclosure Type
AC Power
Lines per
Enclosure
1
Apparent Power
(volt-amps
measured on
single AC line
with one line
powered)
Apparent Power
(volt-amps
measured on
single AC line
with both lines
powered)
5
Peak
Inrush
Current
(amps) (
page 2 of
2)










