NonStop NS1000 Planning Guide (H06.06+)
Installation Facility Guidelines
HP Integrity NonStop NS1000 Planning Guide—542527-002
2-7
Operational Space
Also consider the location and orientation of current or future air conditioning ducts and
airflow direction and eliminate any obstructions to equipment intake or exhaust air flow.
Refer to Cooling and Humidity Control on page 2-4.
Space planning should also include the possible addition of equipment or other
changes in space requirements. Depending on the current or future equipment
installed at your site, layout plans can also include provisions for:
•
Channels or fixtures used for routing data cables and power cables
•
Access to air conditioning ducts, filters, lighting, and electrical power hardware
•
Communications cables, patch panels, and switch equipment
•
Power conditioning equipment
•
Storage area or cabinets for supplies, media, and spare parts










