NonStop NS1000 Planning Guide (H06.08+)

fuses, 53
receptacles, 56
strapping configurations, 91
PDU power
International 200 to 240 V AC input, Single phase, 32A
RMS, 52
International 380 to 415 V AC input, 3-phase Wye, 16A
RMS, 51
North America and Japan 200 to 240 V AC input, Single
phase, 40A RMS, 51
North America and Japan 208 V AC input, 3-phase
delta, 24A RMS, 51
PE, 37, 39
port, 66
power and thermal calculations, 34
power consumption, 20
power distribution units (PDUs), 19, 26
power feed, top or bottom, 19, 26
power input, 25
power quality, 20
power receptacles, PDU, 56
power supply
blade element, 39
VIO enclosure, 61
power-fail
monitoring, 120
states, 122
processor
interconnect cabling, 79
processor element, 37, 39
processor ID, 56
Processor types, 25
R
R5500 XR UPS, 63
rack, 66
rack offset, 66
raised flooring, 22
receiving and unpacking space, 22
receptacles, PDU, 56
recovery, failure, 39
related manuals for NonStop NS-series servers, 123
restrictions
cable length, 79, 108
Fibre Channel device configuration, 84
S
safety ground/protective earth, 20, 27
ServerNet
architecture, 40
fabric, 38
interconnection cabling, 78
internal cabling, 103
optic cabling, 77
ServerNet fabric I/O, 40
ServerNet PCI adapter card, 60
service clearances, 30
service LAN, 113
Site power
using site UPS for, 122
slot, position, 66
specification
cabinet physical, 31
specifications
assumptions, 25
cabinet physical, 31
cable, 78
enclosure dimensions, 32
heat, 33
nonoperating temperature, humidity, altitude, 34
operating temperature, humidity, altitude, 34
weight, 32
startup characteristics, default, 45
static IP addresses, 116
SWAN concentrator restriction, 117
system configurations, examples, 34
system console
configurations, 110
description, 109
overview, 64
system disk location, 45
T
tape drives, 62
terminology, 66
U
U height, enclosures, 30
uninterruptible power supply (UPS), 20, 63
UPS
considerations, 122
HP R5500 XR, 20, 29, 63
user-supplied rackmounted, 21
user-supplied site, 21
V
VIO enclosure
associated processor numbers, 80
configuration considerations, 82
description, 60
disk storage considerations, 82
enclosure location in cabinet, 76
FCDM control, 82
Fibre Channel tape device connection, 82
GMS numbering, 71
interconnection cabling, 78
maintenance switch connection, 63
ServerNet connections, 80
ServerNet pathways, 41
W
weight calculation, 22, 32
worksheet
heat calculation, 33
weight calculation, 32
Z
zinc, cadmium, or tin particulates, 22
127