Cluster I/O Protocols (CIP) Configuration and Management Manual (H06.16+, J06.05+)
e. Depending on your Method of Procedure, if appropriate, deactivate the signal link provided
by the CLIM you are about to upgrade by using CCMI. (The syntax for the instructions are in
the online help.)
f. Abort the CLIM.
> ABORT CLIM O1002571
Open connections still exist, okay to continue? Y
g. Check that the CLIM was stopped.
> STATUS CLIM O1002571
CIP Status CLIM
Name Present State Trace
O1002571 Yes STOPPED OFF
h. Update the form as shown in Table 10: Sample populated Telco CLIM upgrade form:
Table 10 Sample populated Telco CLIM upgrade form
Normal
operations
resumed?
CLIM
restarted
?
Upgrade
done ?
Switch
and
abort
done ?
B/up
CLIM
started ?B/up CLIM name
Storage
pathProvider
Running
Maint
Prov?
If yes,
TypeCLIM name
which
one?
YYO1002572TelcoO1002571
NO1002571TelcoO1002572
i. Continue with “2. Upgrade the Telco CLIM” (page 146).
2. Upgrade the Telco CLIM
a. Perform the software upgrade as described in “Updating CLIM Software Using the OSM
Low-Level Link” (page 147).
b. Return to this procedure and continue with “3. Resume Telco CLIM Normal Operations (skip
if the host system is not running)” (page 146).
3. Resume Telco CLIM Normal Operations (skip if the host system is not running)
a. Check that the upgraded Telco CLIM is operational.
> STATUS CLIM $ZZCIP.*
CIP Status CLIM
Name Present State Trace
N1002541 Yes STARTED OFF
N1002542 Yes STARTED OFF
N1002581 Yes STARTED OFF
N1002582 Yes STARTED OFF
N1012581 Yes STARTED OFF
N1012582 Yes STARTED OFF
O1002571 Yes STARTED OFF
O1002572 Yes STARTED OFF
S1002531 Yes STARTED OFF
S1002532 Yes STARTED OFF
b. Start the Telco CLIM if it is STOPPED.
c. If you deactivated the signal link provided by the CLIM you upgraded, reactivate it by using
CCMI.
d. Check that the links and default activity are restored by using CCMI. See the Guide to
Operations and Maintenance. This may take several minutes.
e. Update the form.
146 Upgrading CIP










