Cluster I/O Protocols (CIP) Configuration and Management Manual (H06.16+, J06.05+)
Table 13 Sample populated IP CLIM group upgrade form
Normal
operations
resumed?
CLIM
restarted
?
Upgrade
done ?
Switch
and
abort
done ?
B/up
CLIM
started ?B/up CLIM name
Storage
path
Running
Maint
Prov?
If yes,
GroupTypeCLIM name
which
one?
YN1002582AIPN1002541
N/ABIPN1002542
N/AZTCP0BIPN1002581
YN1002541ZTCP1AIPN1002582
YN1012582AIPN1012581
YN1012581BIPN1012582
10. Return to steps 3 - 5 of “1. Prepare IP CLIMs for Upgrade (skip if the host system is not running)”
(page 143) and perform the failover for the failover-configured CLIMs in the primary group.
11. For up to four CLIMs in the first group, perform “2. Upgrade the IP CLIMs” (page 144) by using
multiple sessions of OSM Low-Level Link, one for each CLIM.
12. For each CLIM in the group, perform step “3. Resume IP CLIM Normal Operations (skip if the
host system is not running)” (page 144).
Upgrading Groups of Telco CLIMs
CAUTION: Make sure you have a second CLIM that is connected to the same set of links before
you perform the upgrade.
1. Follow the information gathering steps, steps 1 - 4 of “1. Prepare the Telco CLIM for Upgrade
(skip if the host system is not running)” (page 145) then return to this procedure.
2. Divide all Telco CLIM pairs in the system, where both CLIMs are in the started state and the
links are also functioning, into groups, and enter them on the form as shown in Table 14:
Sample populated Telco CLIM group upgrade form:
Table 14 Sample populated Telco CLIM group upgrade form
Normal
operations
resumed?
CLIM
restarted
?
Upgrade
done
?
Switch
and
abort
done ?
B/up
CLIM
started
?B/up CLIM name
Storage
pathProvider
Running
Maint
Prov?
If yes,
GroupTypeCLIM name
which
one?
YO1002572ATelcoO1002571
YO1002571BTelcoO1002572
3. Return to “1. Prepare the Telco CLIM for Upgrade (skip if the host system is not running)”
(page 145), and perform steps 5 - 7, deactivating links and aborting the CLIMs in the first
group. Fill in the group form in this procedure.
4. For up to four CLIMs in the first group, perform step “2. Upgrade the Telco CLIM” (page 146)
by using multiple sessions of OSM Low-Level Link, one for each CLIM.
5. For each CLIM in the group, perform step “3. Resume Telco CLIM Normal Operations (skip
if the host system is not running)” (page 146).
164 Upgrading CIP










