Expand Configuration and Management Manual (H06.21+, J06.10+)
Subsystem Control Facility (SCF) Commands
Expand Configuration and Management Manual — 529522-013
14 - 104
STATUS LINE Command
STATUS
indicates the status of the line: ready or not ready.
PPID
is the primary process ID.
BPID
is the backup process ID.
CIU-Path
indicates which ServerNet wide area network (SWAN) concentrator path (A or B) is
being used by this line to communicate with the SWAN concentrator. This field only
applies to lines connected to a SWAN concentrator.
ConMgr-LDEV
is the logical device (LDEV) number of the concentrator manager (ConMgr)
process. The ConMgr process is part of the WAN subsystem. This field only
applies to lines connected to a ServerNet wide area network (SWAN) concentrator.
For direct-connect and satellite-connect line-handler processes, the display for a LINE
object with the DETAIL option has the format as shown in Example 14-36:
PPID
is the primary process ID.
BPID
is the backup process ID.
State
indicates the summary state of the line. The line is in either the STARTED or
STOPPED state.
Example 14-36. STATUS LINE, DETAIL Command, Direct- and Satellite-Connect
Line-Handler Processes
-> STATUS LINE $SWNYE2, DETAIL
EXPAND Detailed Status LINE $SWNYE2
PPID............... ( 2, 327) BPID................. ( 3, 277)
State.............. STARTED Path LDEV............ 303
Trace Status....... OFF Clip Status.......... LOADED
ConMgr-LDEV........ 72 Status READY
SWAN Track Id...... X017NU Clip................. 1
Line............... 1 Path................. B
IP Address......... 172.17.208.82 Effective line priority 1
Trace File Name.... none










