NonStop NS2200 Series Planning Guide
For physical dimensions of the server equipment, see “Dimensions and Weights” (page 78).
Operational Space
When planning the layout of the server site, use the equipment dimensions, door swing, and service
clearances listed in “Dimensions and Weights” (page 78). Because location of the lighting fixtures
and electrical outlets affects servicing operations, consider an equipment layout that takes advantage
of existing lighting and electrical outlets.
Also consider the location and orientation of current or future air conditioning ducts and airflow
direction and eliminate any obstructions to equipment intake or exhaust air flow. For more
information, see “Cooling and Humidity Control” (page 53).
Space planning should also include the possible addition of equipment or other changes in space
requirements. Depending on the current or future equipment installed at your site, layout plans can
also include provisions for:
• Channels or fixtures used for routing data cables and power cables
• Access to air conditioning ducts, filters, lighting, and electrical power hardware
• Communications cables, patch panels, and switch equipment
• Power conditioning equipment
• Storage area or cabinets for supplies, media, and spare parts
Operational Space 55










