NonStop NS2400 Series Planning Guide

P
Particulates, metallic, 126
particulates, metallic, 50
paths, operating system load, 167
PDU
description, 171, 172
fuses, 171, 173, 174
receptacles, 66, 182
strapping configurations, 66, 182
PDUs, 52, 171
port, 36, 114
Ports, opening on console, 160
power and thermal calculations, 82
Power consumption, 123
power consumption, 47
Power distribution units (PDUs), 52, 171
power distribution units (PDUs), 46, 60, 172
power feed, top or bottom, 46, 60, 172
power input, 60, 172
Power quality, 123
power quality, 47
power receptacles, PDU, 66, 182
Power-fail
importance of changing ride-through factory-default
setting , 72
monitoring, 71
power-fail
states, 73
processor
interconnect cabling, 84, 146
processor ID, 21, 108
R
R12000/3 UPS, 33
R5000 UPS for single-phase, 33
rack, 35, 114
rack offset, 35, 36, 114, 115
raised flooring, 49
Raised floors, requirements for, 124
Receiving and unpacking, 125
receiving and unpacking space, 50
receptacles, PDU, 66, 182
Restrictions
cable length, NS2400 series, 162
Ride-Through time
importance of changing factory-default setting, 72
power-fail, 72
S
safety ground/protective earth, 47, 129
SAS disk enclosure
connecting, 84, 146
overview, 31
SAS Tape
connecting, 85, 147
Seismic rack
ground connections, 138
grounding rails, 138
heat dissipation worksheet, 144
payload limit, 107
power load worksheet, 135, 145
specifications, 138
Service clearances
commercial grade cabinets, 128
service clearances, 75
Service LAN, 153
Site power
using site UPS for, 73
Site power cables
reference documentation, 170
requirements, 170
slot, position, 35, 114
specification
cabinet physical, 77
cabinet physical, 42U G2 rack, 76
Specifications
160 DAT enclosure, 132
CG maintenance switch, 132, 142
CLIM, 131, 140
DAT tape enclosure, 141
disk enclosure, 131, 141
environmental, 127, 137
fuse panel, 129, 139
rack, 138
specifications
assumptions, 52
cabinet physical, 76
cabinet physical, 36U intelligent rack, 76
enclosure dimensions, 77
heat, 80
nonoperating temperature, humidity, altitude, 81
operating temperature, humidity, altitude, 81
weight, 78
Star washers
and ground cables, 129
startup characteristics, default, 167
Storage CLIM, 23, 108
see also CLIMs
HBA slots, 24, 109
overview, 23, 108
Storage CLIM (Gen8)
HBA slots, 25
Storage CLIM, illustration of ports and HBAs, 85
SWAN concentrator restriction, 158
System console
configurations, 160
description, 153
overview, 32, 111
system disk location, 167
T
tape drives, 35
Tape enclosure
specifications, 132
Tape unit see DAT 160 tape unit enclosure
Telco CLIM , 29, 113
see also CLIMs
terminology, 35, 114
203