NonStop NS2400 Series Planning Guide

Figures
1 Example of a NonStop NS2400 System, 42U......................................................................20
2 Connections Between Storage CLIMs and ESS.....................................................................34
3 VIO Enclosure Slot Locations, NS2400 System.....................................................................40
4 DL380 G6 Storage CLIM Connections to VIO Enclosures (NS2400).......................................41
5 DL380 G6 IP or Telco CLIM Connections to VIO Enclosures (NS2400)....................................42
6 DL380p Gen8 Storage CLIM Connections to VIO Enclosures.................................................43
7 DL380p Gen8 IP or Telco CLIM Connections to VIO Enclosures..............................................44
8 Intelligent PDU Connections (Without UPS)..........................................................................54
9 Intelligent PDU Connections (With Single-Phase UPS)............................................................55
10 Intelligent PDU Connections (With Three-Phase UPS).............................................................56
11 Modular PDU Connections (Without UPS)............................................................................57
12 Modular PDU Connections (With Single-Phase UPS).............................................................58
13 Modular PDU Connections (With Three-Phase UPS)..............................................................59
14 Example of Bottom AC Power Feed Without UPS..................................................................61
15 Example of Top AC Power Feed Without UPS.......................................................................62
16 Example of Top AC Power Feed With Single-Phase UPS........................................................63
17 Example of Bottom AC Power Feed With Single-Phase UPS ...................................................64
18 Example of Top AC Power Feed With Three-Phase UPS ........................................................65
19 Example of Bottom AC Power Feed With Three-Phase UPS.....................................................66
20 HP M8381-25 SAS Disk Enclosure, Front and Rear View........................................................86
21 Two DL380 G6 Storage CLIMs, Two M8381-25 SAS Disk Enclosure Configuration....................87
22 Two DL380 G6 Storage CLIMs, Four M8381-25 SAS Disk Enclosure Configuration....................88
23 Four DL380 G6 Storage CLIMs, Four M8381-25 SAS Disk Enclosure Configuration...................89
24 Two DL380p Gen8 Storage CLIMs, Two M8381-25 SAS Disk Enclosure Configuration...............90
25 Two DL380p Gen8 Storage CLIMs, Four M8381-25 SAS Disk Enclosure Configuration..............91
26 Four DL380p Gen8 Storage CLIMs, Four M8381-25 SAS Disk Enclosure Configuration..............92
27 Four DL380p Gen8 Storage CLIMs, Eight M8381-25 SAS Disk Enclosure Configuration.............93
28 Example 42U Intelligent Rack Configuration Without UPS and ERM......................................100
29 Example 42U Intelligent Rack Configurations With Possible UPS/ERM Combinations..............101
30 Example 36U Intelligent Rack Configuration Without UPS and ERM......................................102
31 Example 36U Intelligent Rack Configurations With Possible UPS/ERM Combinations..............103
32 Example of NonStop NS2400T and NonStop NS2400ST Systems in G2 Rack and Cabinet....106
33 HP M8391-24x and M8392-24x Disk Enclosure, Front View.................................................109
34 HP M8391-24x and M8392-24x Disk Enclosure, Back View.................................................110
35 Fuse Panel.....................................................................................................................110
36 CG Maintenance Switch, Front View.................................................................................111
37 CG Maintenance Switch, Back View................................................................................111
38 DAT 160 Tape Unit.........................................................................................................113
39 VIO Enclosure Slot Locations (NS2400T and NS2400ST Systems)........................................118
40 Storage CLIM CG Connections to VIO Enclosures...............................................................119
41 IP CLIM CG or Telco CLIM CG Connections to VIO Enclosures.............................................120
42 36U Configurations, NonStop NS2400T...........................................................................150
43 42U Configurations, NonStop NS2400T...........................................................................151
44 36U Seismic Rack Configurations.....................................................................................152
45 Example of a Fault-Tolerant LAN Configuration..................................................................155
46 Bottom AC Power Feed Without UPS and ERM (Single-Phase or Three-Phase).........................173
47 Top AC Power Feed Without UPS and ERM (Single-Phase or Three-Phase).............................174
48 Top AC Power Feed With UPS and ERM Installed, Single-Phase............................................175
49 Bottom AC Power Feed With UPS and ERM Installed, Single-Phase.......................................176
50 Top AC Power Feed With UPS and Single-Phase Modular PDUs...........................................177
51 Bottom AC Power Feed With UPS and Single-Phase Modular PDUs.......................................178
52 Extension Bar Connections for Single-Phase Modular PDUs (No UPS)....................................179