DSM/SCM and Public DLLs
Creating a SIT is not supported in H-series RVUs.
Similar to G-series RVUs, you might have to update both the client and server-side
SPRs. For H06.05, the PI screen displays G02/H02 for the client side and H02 for
the server side.
As of G06.27, you can manage an H-series target system from a G-series host
system. However, you cannot currently manage a G-series target system from an
H-series host.
When you upgrade the client and server SPRs for DSM/SCM, you must also
upgrade the SWID product (T9298H02) at the same time to avoid a fingerprint or
mismatched file problem. For the H06.05 RVU, SWID is already installed.
DSM/SCM and Public DLLs
In H-series RVUs, DSM/SCM manages and controls the distribution, installation, and
activation of public DLLs on Integrity NonStop NS-series servers similarly to the way
DSM/SCM handles public SRLs on NonStop S-series systems. Public DLLs are
installed on the H-series target systems in their own subvolume.
Starting with the G06.18 RVU, a new configuration file, A7CINFO, is introduced for
managing OSS files. To manage OSS files in H-series RVUs, use the T6031H01 or
later PVU. The corresponding client version or Planner Interface must also be installed.
For H06.05, the PVU for the client is T6031G02/H02 and the PVU for the server side is
T6031H02. (In H-series RVUs, the T6030 PV has been obsoleted and does not appear
on the SUT.)
DSM/SCM and OSS
When performing a Build/Apply, ensure that the setting of the Manage OSS Files
option matches with your target system. If the target system is not to use OSS, you
must uncheck the OSS files option box before beginning a Build request. If the box is
left checked, OSS is included by the Build request. The OSS root fileset needs to be
configured and started before files can be copied into the OSS file system by
DSM/SCM. For OSS users who request HP to install OSS, it is assumed that OSS is
installed and configured. However, the OSS root fileset ($ZPNS) must be in the started
state; otherwise, the Build/Apply fails.
Upgrading the DSM/SCM Client (Planner Interface) and the
T6031H02 PVU
To upgrade the DSM/SCM client, if you did not order new system consoles, the
DSM/SCM client version must be downloaded from the ZDSMSCM subvolume. (If you
have acquired new system consoles, the most up-to-date DSM/SCM client is already
installed.) To download from ZDSMSCM the client version (Planner Interface) to a
separate PC console or your current console, follow the client or Planner Interface
installation instructions in the DSM/SCM User’s Guide or Appendix B, Installing SWID,
DSM/SCM PVU, and Planner Interface (PI) Client Software.