H06.05 Software Installation and Upgrade Guide

Hewlett-Packard Company541762-003
i
H06.05 Software Installation and
Upgrade Guide
Glossary Index Tables
What’s New in This Manual ix
Manual Information ix
New and Changed Information ix
About This Manual xi
Who Should Use This Guide xi
What This Guide Does Not Cover xi
How This Guide Relates to Other Manuals xii
Notation Conventions xii
1. Overview of Installing the H06.05 RVU
Disk Space Requirements 1-1
Operational Differences Between the H06.05 and G-series RVUs 1-1
Investigating an H-Series RVU 1-2
System Console Requirements 1-3
Updating System Consoles (Optional) 1-3
Using OSM With the H06.05 RVU 1-4
OSM Server-Based Components 1-4
OSM Client-Based Components 1-4
Using DSM/SCM With the H06.05 RVU
1-5
DSM/SCM and the H06.05 RVU
1-5
DSM/SCM and Public DLLs 1-6
DSM/SCM and OSS 1-6
Upgrading the DSM/SCM Client (Planner Interface) and the T6031H02 PVU 1-6
Summary of Software Installation Tasks 1-7
Check or Alter the CONFTEXT File Before Installing an H06.05 SUT 1-8
Managing Microcode and Firmware for Integrity NonStop NS-Series Servers 1-8
Managing Maintenance Entity Firmware for Processor Switch and I/O Adapter
Module (IOAM) 1-9
Managing Firmware in a NonStop Blade Complex 1-12
Managing ServerNet Adapter Firmware 1-17
Managing SWAN and SWAN 2 Concentrator Firmware 1-20
Managing NonStop Cluster Switch Firmware 1-21