H06.18 Software Installation and Upgrade Guide
About This Document
This guide describes:
• Upgrading the initial H06.18 RVU through the use of site update tape (SUT) refreshes, if
necessary.
• Falling back to a previous SYSnn.
This document might be revised between DVD publications. A more recent version of this document
might exist online in the HP Integrity NonStop H-Series collection of the NonStop Technical Library
(NTL) at http://www.hp.com/go/nonstop-docs.
Supported Release Version Updates (RVUs)
This manual supports the H06.18.00 RVU and all subsequent H06.18..nn RVURs unless otherwise
noted. Exceptions are described in the text.
Intended Audience
This guide is written for operations staff and support personnel and requires a working knowledge
of Windows Server 2003 or Windows Server 2008, HP NonStop Open System Management
(OSM) Interface client and server components, system console software, NonStop Software
Essentials, DSM/SCM, Target Interface (ZPHITI), and ZPHIRNM applications.
New and Changed Information in This Edition
This edition includes these changes:
• support for the DHCP DNS configuration wizard
• support for NonStop Software Essentials
• changes to privilege requirements for running SSOCLIM after RVU and CLIM fallback
Changes are indicated by change bars.
New and Changed Information in Previous Editions
Change bars for previous editions have been retained in the current edition.
The 538127-006 edition contained these changes:
• Introductory microcode and firmware information in “Managing Microcode and Firmware”
(page 26) has been updated to reference the NonStop Firmware Matrices for compatible
firmware versions.
• “Managing CLIM Firmware” (page 36) is updated to reference the NonStop Firmware Matrices
for compatible firmware on CLIM components and to use the Cluster I/O Protocols (CIP)
Configuration and Management Manual for upgrade instructions.
• Additional information about USERID attributes for persistent processes has been added to
“DSM/SCM Upgrade Issues/Interoperability SPR Requirements” (page 60) in “H06.18”
(page 60) of Chapter 3.
The 538127-005 edition contained a change to Step 3 in the “Complete CLIM Setup” (page 154)
section for the need to reboot Storage CLIMs after executing the clearlog command.
Supported Release Version Updates (RVUs) 11