H06.27 Software Installation and Upgrade Guide

SECURE ($SYSTEM.TEMPLATE.NEWRES,$SYSTEM.TEMPLATE.NEWNRES),"NUNU"
*** INSTALL^TEMPLATES: Completed sucessfully ***
If a System Load Is Required
If OSM is installed and configured, use these instructions to load your RVU.
Before Halting the Processors
If you are falling back to the H06.03 or H06.04 RVU, then before halting the processors, update
the shadow firmware on each NonStop Blade Element, as described under“Reverting to H06.03
or H06.04 From This RVU” (page 155) .
Halt the Processors
1. If necessary, log on to the OSM Low-Level Link.
On the toolbar, select Processor Status to open the Processor Status dialog box.
2. Select the processors to be halted.
3. From the Processor Actions list, select Halt.
4. Click Perform action.
5. Click OK when asked if you are sure you want to halt.
6. When the Action Status box confirms that all the processors have been halted, close the
Processor Status dialog box.
7. Do not log off the OSM Low-Level Link.
Perform a System Load
A normal system load consists of loading the operating system from disk into the memory of
processor 0 or processor 1.
See Chapter 9 (page 115), for information on performing a system load.
Start Your Applications and Processes
After you have reloaded the processors and the Processor Status screen shows all processors
executing the NonStop operating system, you can start your applications and processes. See
Chapter 10: “Resuming Normal Operations”.
Verify that your system is up and running. See Chapter 9: “Loading This RVU”.
170 Using DSM/SCM With the Planner Interface to Install SPRs