J06.04 Software Installation and Upgrade Guide

#ZTA07 STOPPED 0 0
#ZTA08 STOPPED 0 0
#ZTA09 STOPPED 0 0
#ZTA10 STOPPED 0 0
#ZTA11 STOPPED 0 0
#ZTA12 STOPPED 0 0
#ZTA13 STOPPED 0 0
#ZTA14 STOPPED 0 0
#ZTA15 STOPPED 0 0
Total Errors = 0 Total Warnings = 0
$ADBIT TESTBIT 12>
1. In the DSM/SCM Planner Interface, in the Configuration Revisions dialog box, select the target
configuration.
2. Select Maintain>Target Maintenance>Modify.
a. Check that the Manage OSS Files option is selected.
b. Click Output to view the default output values.
c. Enter the appropriate values in the data fields.
44 Installing a SUT for the J06.04 RVU