J06.04 Software Installation and Upgrade Guide
Table 14 System Load Paths in Order of Use for CLIM Attached-Load
Over ServerNet FabricTo ProcessorData Travels FromDescriptionLoad Path
X0$SYSTEM-PPrimary1
Y0$SYSTEM-PPrimary2
Y0$SYSTEM-BBackup3
X0$SYSTEM-BBackup4
X0$SYSTEM-MMirror5
Y0$SYSTEM-MMirror6
Y0$SYSTEM-MBMirror backup7
X0$SYSTEM-MBMirror backup8
Y1$SYSTEM-PPrimary9
X1$SYSTEM-PPrimary10
X1$SYSTEM-BBackup11
Y1$SYSTEM-BBackup12
Y1$SYSTEM-MMirror13
X1$SYSTEM-MMirror14
X1$SYSTEM-MBMirror backup15
Y1$SYSTEM-MBMirror backup16
• A CLIM Attached-Load attempts to load the system from a system disk in the NonStop Storage
CLIMs connected to a ServerNet switch
CLIM Attached-Load for system with 2 CLIMs over $SYSTEM:
ServerNet Switch
Mirror LUNPrimary LUNFiberConnectorSlotModuleGroupPath
N/A1011352100Primary
N/A1013352100Backup
201N/A3352200Mirror
201N/A1352100Mirror Backup
CLIM Attached-Load for System with 4 CLIMs over $SYSTEM:
ServerNet Switch
Mirror LUNPrimary LUNFiberConnectorSlotModuleGroupPath
N/A1011352100Primary
N/A1011452100Backup
101N/A3452100Mirror
101N/A3352100Mirror Backup
62 Loading the J06.04 RVU