J06.09 Software Installation and Upgrade Guide
Be sure to select the CLIM type for the type of CLIM you are configuring from the Mode of
operation pull-down menu. After entering the required information in the dialog box, press
Configure. Here is an example screen showing the CLIM preparation has successfully
completed:
Sample Pre-ABK Version of OSM Low-Level Link, IP CLIM
Sample ABK or later Version of OSM Low-Level Link Version, IP CLIM
124 Falling Back on the CLIMs, Loading the Previous RVU, and Resuming Normal Operations