Site Preparation Guide - HP Integrity rx1620
General Site Preparation Guidelines
Sample Site Inspection Checklist
Chapter 3
36
Sample Site Inspection Checklist
Table 3-4 Customer and Hewlett-Packard Information
Customer Information
Name: Phone No:
Street Address: City
or
Town:
State or Province: Country
Zip or postal code:
Primary customer contact: Phone No.:
Secondary customer contact: Phone No.:
Traffic coordinator: Phone No.:
Hewlett-Packard information
Sales representative: Order No:
Representative making survey: Date:
Scheduled delivery date:
Table 3-5 Site Inspection Checklist
Please check either Yes or No. If No, include comment# or date Comment or Date
Computer room
No. Area or condition Yes No
1. Is there a completed floor plan?
2. Is there adequate space for maintenance needs?
Front 36 in (91.4 cm) minimum, rear 36 in (91.4 cm)
minimum are recommended clearances.
3. Is access to the site or computer room restricted?
4. Is the computer room structurally complete?
Expected date of completion?
5. Is a raised floor installed and in good condition?
6. Is the raised floor adequate for equipment loading?
7. Are there channels or cutouts for cable routing?
8. Is there a remote console telephone line available with an
RJ11 jack?