Site Preparation Guide - HP Integrity rx1620
General Site Preparation Guidelines
Delivery Survey
Chapter 3
38
Delivery Survey
The delivery survey forms list delivery or installation requirements. If any of the items on the list apply, enter
the appropriate information in the areas provided on the form.
Special instructions or recommendations should be entered on the special instructions or recommendations
form. The following list gives examples of special instructions or issues:
• Packaging restrictions at the facility, such as size and weight limitations
• Special delivery procedures
• Special equipment required for installation, such as tracking or hoists
• What time the facility is available for installation (after the equipment is unloaded)
• Special security requirements applicable to the facility, such as security clearance
No. Area or condition Yes No
27. Can cooling be maintained between 20° C and 55° C (up to
5,000 ft.)? Derate 1° C/1,000 ft. above 5,000 ft. and up to
10,000 ft.
28. Can temperature changes be held to 10° C per hour with
tape media? Can temperature changes be held to 20° C per
hour without tape media?
29. Can humidity level be maintained at 40% to 60% at 35° C
noncondensing?
30. Are air conditioning filters installed and clean?
Storage
No. Area or condition Yes No
31. Are cabinets available for tape and disc media?
32. Is shelving available for documentation?
Training
No. Area or Condition
33 Are personnel enrolled in the System Administrator’s
Course?
34 Is on-site training required?
Table 3-5 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date Comment or Date