Rack to Tower and Tower to Rack System Conversion Guide (June 2005)

Chapter 3
Converting a Rack System to a Tower System
Process for Converting Your Rack System to a Tower System
19
Step 4. Position the front access panel at an approximate 45 degree angle with the front of the
system and insert its retaining slots onto the retaining tabs located on the system’s
chassis. See Figure 3-11. Rotate the front access panel inward until it snaps in place.
Figure 3-11 Install the Front Panel
Step 5. Connect all of the system’s power and external cables and turn the system on.
Retaining Tabs
Front
Access
Panel
Front of
System
Retaining Slots