HP Integrity rx2660 Server User Service Guide
Replacing the Airflow Guide
To replace the airflow guide:
1. Ensure the fan carrier handle is raised enough to replace the airflow guide.
2. Place the airflow guide on the edge of the fan carrier and push it down into place on the
processor cage (1). See Figure 42 (page 145).
3. Push the fan carrier handle down until it is flush against the airflow guide (2).
Figure 42 Replacing the Airflow Guide
4. Ensure that the fans are seated correctly in their connectors by gently pressing down on each
fan in the fan carrier.
5. Replace the top cover. See “Replacing the Top Cover” (page 142).
6. Replace the server back into the rack. See “Inserting the Server into the Rack” (page 141).
Removing and Replacing a Hot-Swappable Server Fan
When removing a hot-swappable server fan from the server, there are different procedures
depending on if you have a Data Center server or an Office Friendly server.
Data Center Server
Twelve fans cool the Data Center server. The fans are all redundant, hot-swappable, and
interchangeable. Fans 1 through 8 are located in a removable fan carrier directly behind the front
bezel. Fan units 9 through 12 are located in a removable I/O fan carrier between the SAS
backplane and the I/O card cage. The server is set up into three cooling zones. Fans 1 through
4 cool Zone 1. Fans 5 through 8 cool Zone 2. Fans 9 through 12 cool Zone 3. Each zone can
have one fan failure and still run, with the other fans in the zone speeding up until the failed fan
is replaced. Replace the fans using the procedures in this section whether the server is powered
on or off.
Removing and Replacing a Hot-Swappable Server Fan 145