HP Integrity rx7620 Server - User Service Guide, Sixth Edition
— A signed copy of the site inspection and delivery survey mailed to HP
— Site inspection and predelivery coordination meeting arranged with a HP representative
to review the inspection checklist and arrange an installation schedule.
• 7 days before installation
— Final check made with an HP site preparation specialist to resolve any last minute
problems
NOTE: Not all installations follow a schedule like the one noted above. Sometimes, a server is
purchased through another vendor which can preclude a rigid schedule. Other conditions could
also prevent following this schedule. For those situations, consider a milestone schedule.
• Site Preparation - schedule with the customer as soon as possible after the order is placed.
• Site Verification - schedule with the customer a minimum of one to two days before the
product is scheduled to be installed.
Sample Site Inspection Checklist
Table C-5 Customer and HP Information
Customer Information
Phone No:Name:
City or Town:Street Address:
CountryState or Province:
Zip or postal code:
Phone No.:Primary customer contact:
Phone No.:Secondary customer contact:
Phone No.:Traffic coordinator:
HP information
Order No:Sales representative
Date:Representative making survey
Scheduled delivery date
Table C-6 Site Inspection Checklist
Comment or DatePlease check either Yes or No. If No, include comment# or date
Computer room
NoYesArea or conditionNo.
Is there a completed floor plan?1.
Is there adequate space for maintenance needs?
Front 36 in (91.4 cm) minimum, Rear 36 in (91.4 cm) minimum are
recommended clearances.
2.
Is access to the site or computer room restricted?3.
Is the computer room structurally complete?
Expected date of completion?
4.
Is a raised floor installed and in good condition?5.
Is the raised floor adequate for equipment loading?6.
Are there channels or cutouts for cable routing?7.