HP Integrity rx7620 Server - User Service Guide, Sixth Edition
Table C-6 Site Inspection Checklist (continued)
Comment or DatePlease check either Yes or No. If No, include comment# or date
Is there a remote console telephone line available with an RJ11 jack?8.
Is a telephone line available?9.
Are customer supplied peripheral cables and LAN cables available
and of the proper type?
10.
Are floor tiles in good condition and properly braced?11.
Is floor tile underside shiny or painted? If painted, judge the need
for particulate test.
12.
Power and lighting
NoYesArea or conditionNo.
Are lighting levels adequate for maintenance?13.
Are there AC outlets available for servicing needs? (i.e. vacuuming)14.
Does the input voltage correspond to equipment specifications?15.
Is dual source power used? If so, identify type(s) and evaluate
grounding.
15A
Does the input frequency correspond to equipment specifications?16
Are lightning arrestors installed inside the building?17.
Is power conditioning equipment installed?18.
Is there a dedicated branch circuit for equipment?19.
Is the dedicated branch circuit less than 250 feet (72.5 meters)?20.
Are the input circuit breakers adequate for equipment loads?21.
Safety
NoYesArea or conditionNo.
Is there an emergency power shut-off switch?22.
Is there a telephone available for emergency purposes?23.
Is there a fire protection system in the computer room?24.
Is antistatic flooring installed?25.
Are there any equipment servicing hazards (loose ground wires,
poor lighting, etc.)?
26.
Cooling
NoYesArea or conditionNo.
Can cooling be maintained between 20 °C and 55 °C (up to 5000
ft.)? Derate 1 °C/1000 ft. above 5000 ft. and up to 10,000 ft.
27.
Can temperature changes be held to 10 °C per hour with tape
media? Can temperature changes be held to 20 °C per hour without
tape media?
28.
Can humidity level be maintained at 40% to 60% at 35 °C
noncondensing?
29.
Are air conditioning filters installed and clean?30.
Storage
Sample Site Inspection Checklist 201