Site Preparation Guide, Fourth Editon - HP Integrity rx7620 Server
Appendix B
General Site Preparation Guidelines
Sample Site Inspection Checklist
58
7. Are there channels or cutouts for cable routing?
8. Is there a remote console telephone line
available with an RJ11 jack?
9. Is a telephone line available?
10. Are customer supplied peripheral cables and
LAN cables available and of the proper type?
11. Are floor tiles in good condition and properly
braced?
12. Is floor tile underside shiny or painted? If
painted, judge the need for particulate test.
Power and lighting
No. Area or condition Yes No
13. Are lighting levels adequate for maintenance?
14. Are there AC outlets available for servicing
needs? (i.e. vacuuming)
15. Does the input voltage correspond to equipment
specifications?
15A Is dual source power used? If so, identify type(s)
and evaluate grounding.
16 Does the input frequency correspond to
equipment specifications?
17. Are lightning arrestors installed inside the
building?
18. Is power conditioning equipment installed?
19. Is there a dedicated branch circuit for
equipment?
20. Is the dedicated branch circuit less than 250
feet (72.5 meters)?
21. Are the input circuit breakers adequate for
equipment loads?
Safety
No. Area or condition Yes No
22. Is there an emergency power shut-off switch?
Table B-6 Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
Comment
or Date