HP Integrity rx7640 and HP 9000 rp7440 Servers Installation Guide
Figure 19 Positioning the Lifter to the Pallet
4. Carefully slide server onto lifter forks.
5. Slowly raise the server off the pallet until it clears the pallet cushions.
Figure 20 Raising the Server Off the Pallet Cushions
6. Carefully roll the lifter and server away from the pallet. Do not raise the server any higher
than necessary when moving it over to the rack.
Using the RonI Model 17000 SP 400 Lifting Device 31










