HP Integrity rx7640 and HP 9000 rp7440 Servers Installation Guide

CPUs reside in the purchased system and are tracked as HP-owned assets. A nominal
“Right-To-Access Fee” is paid to HP for each Instant Capacity CPU in the system. Any number of
Instant Capacity CPUs can be activated at any time. Activating an Instant Capacity CPU
automatically and promptly transforms the Instant Capacity CPU into an instantly ordered and
fulfilled CPU upgrade that requires payment. After the Instant Capacity CPU is activated and paid
for, it is now an ordered and delivered CPU upgrade for the system rather than an Instant Capacity
CPU.
The following list offers information needed to update to iCAP version 8.x:
HP-UX HWEnable 11i - Hardware Enablement Patches for HP-UX11i v2, June 2006
B9073BA - B.11.23.08.00.00.95 - HP-UX iCOD Instant Capacity (iCAP)
Kernel entry - diag2 - module diag2 best [413F2ED6]
B8465BA - A.02.00.04 - HP WBEM Services for HP-UX
NPar Provider - B.11.23.01.03.00.06 - nPartition Provider
Current information on installing, configuring, and troubleshooting iCAP version 8.x is available
by entering the document part number, B9073-90192 into the search field of the following website:
http://www.hp.com/go/bizsupport
Information on the latest release notes for iCAP version 8.x can be found in the same document.
NOTE: Ensure that the customer is aware of the Instant Capacity email requirements. See http://
www.hp.com/go/bizsupport for further details.
Installation Checklist
The checklist in Table 11 is an installation aid. Use it only after you have installed several systems
by following the detailed procedures described in the body of this document. This checklist is a
compilation of the tasks described in this manual, and is organized as follows:
Procedures The procedures outlined in this document in order
In-process The portion of the checklist that allows you to comment on the current status of a
procedure
Completed The final check to ensure that a step has been completed and comments
Major tasks are in bold type, sub tasks are indented.
Table 11 Factory-Integrated Installation Checklist
CompletedIn-processProcedure
CommentsInitialsCommentsInitials
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements verified
Check inventory
Inspect shipping containers for
damage
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
64 Installing the Server