HP Integrity rx7640 and HP 9000 rp7440 Servers User Service Guide
Figure 17 RonI Lifter
1. Obtain the HP J1530C Rack Integration Kit Installation Guide before proceeding with the rack
mount procedure. This guide covers these important steps:
• Installing the anti-tip stabilizer kit (A5540A)
• Installing the ballast kit (J1479A)
• Installing the barrel nuts on the front and rear columns
• Installing the slides
2. Follow the instructions on the outside of the server packaging to remove the banding and
carton top from the server pallet.
3. Carefully roll the lift forward until it is fully positioned against the side of the pallet.
Using the RonI Model 17000 SP 400 Lifting Device 39










