HP Integrity rx8620 Server User Service Guide

Before powering up the server cabinet for the first time:
1. Verify that the AC voltage at the input source is within specifications for each server cabinet
being installed.
2. If not already done, power on the serial display device.
The preferred tool is the CE Tool running Reflection 1.
To power on the MP, set up a communications link, and log in to the MP, follow these steps:
1. Apply power to the server cabinet.
Apply power to any other server cabinets that were shipped to the customer site.
On the front of the server, a solid green Standby Power, and a solid green MP Present light
will illuminate after about 30 seconds.
Figure 4-10 Front Panel Display
2. Check the bulk power supply (BPS) LED for each BPS. See Figure 4-11 for the LED location.
When on, the breakers distribute power to the BPS. AC power is present at the BPS:
When power is first applied. Note the BPS LEDs will be flashing amber.
After 30 seconds have elapsed. Note the flashing amber BPS LED for each BPS becomes
a flashing green LED.
Figure 4-11 BPS LED Location
Turning On Housekeeping Power and Logging In to the MP 67