HP Integrity rx8620 Server User Service Guide
The most current information on installing, configuring, and troubleshooting iCOD can be found
at http://hp.com.
NOTE: Ensure that the customer is aware of the iCOD email requirements. For further details,
see http://hp.com.
Using the Checklist
The following checklist is an installation aid and should be used only after you have installed
several systems using the detailed procedures described in the body of this manual. This checklist
is a compilation of the tasks described in this manual, and is organized as follows:
PROCEDURES The procedures outlined in this document in order.
IN-PROCESS The portion of the checklist that enables you to comment on the current status
of a procedure.
COMPLETED The final check to ensure that a step has been completed and comments.
Major tasks are in bold type, sub tasks are indented.
Table 4-3 Factory-Integrated Installation Checklist
COMPLETEDIN-PROCESSPROCEDURE
CommentsInitialsCommentsInitials
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements
verified
Check inventory
Inspect shipping containers for
damage
Unpack SPU cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and
remove the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Unpack the peripheral cabinet
(if ordered)
Unpack other equipment
Using the Checklist 77