Installation Guide, Sixth Edition - HP Integrity rx8620 Server

Chapter 2
Installation
Cabling and Power Up
66
Voltage Range Verification of Receptacle
This measures the voltage between L1 and L2, L1 to ground, and L2 to ground. Three separate
measurements are performed during this procedure. Refer to Figure 2-21 for voltage reference
points when performing the following measurements.
Figure 2-21 Voltage Reference Points for IEC-320 C19 Plug
IMPORTANT These measurements must be performed for every power cord that plugs into the HP
Integrity rx8620 Server.
Step 1. Measure the voltage between L1 and L2. This is considered to be a phase-to-phase measurement in
North America. In Europe and certain parts of Asia-Pacific, this measurement is referred to as a
phase-to-neutral measurement. The expected voltage should be between 200–240 VAC regardless
of the geographic region.
Step 2. Measure the voltage between L1 and ground. In North America, verify this voltage is between
100–120 VAC. In Europe and certain parts of Asia-Pacific, verify this voltage is between
200–240 VAC.
Step 3. Measure the voltage between L2 and ground. In North America, verify this voltage is between
100–120 VAC. In Europe and certain parts of Asia-Pacific, verify this voltage is 0 (zero) VAC.
Table 2-6 provides single phase voltage measurement examples dependent on the geographic region where
these measurements are taken.
Table 2-6 Single Phase Voltage Examples
Japan
North
America
Europe
a
a. In some European countries there may not be a
polarization.
L1-L2 210V 208V or 240V 230V
L1-GND 105V 120V 230V
L2-GND 105V 120V 0V
VV
Step 3Step 2
L1 L2
GND
Step 1
V